Warning: Use of undefined constant ’WP_MEMORY_LIMIT’ - assumed '’WP_MEMORY_LIMIT’' (this will throw an Error in a future version of PHP) in /home/rsaenvir/public_html/irrigation-solutions/wp-config.php on line 163

Warning: Use of undefined constant ‘128M’ - assumed '‘128M’' (this will throw an Error in a future version of PHP) in /home/rsaenvir/public_html/irrigation-solutions/wp-config.php on line 163

Warning: Declaration of mysiteDescriptionWalker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/rsaenvir/public_html/irrigation-solutions/wp-content/themes/modular/lib/classes/menu-walker.php on line 45
The System
Call Us Today (909) 946 0964

The System

The RSA/Replogle Metering Pipe System has been specially developed to provide an accurate, economic and convenient solution for Water Districts to comply with the now passed SBx7-7 law.

Homepage Mccrometer

RSA/Replogle Metering Pipe System

With an exclusive arrangement utilizing the McCrometer Reverse Propeller Flow Meter placed inside an HDPE pipe with proprietary flow conditioning and anti-fouling elements the RSA/Replogle Metering Pipe System will perform well within the specified accuracy requirements of the SBx7-7 law. Each scaled system is a 12 months of the year retrofit, uses a 5-year lithium battery totalizer and takes less than half a day to install.

No High-Tech Knowledge Required: The pipe and propeller flow measuring system can usually be attached to the existing canal head gate and pipeline system… This attachment and field installation required ordinary construction skills. – John Replogle

According to Dr. John Replogle the RSA/Replogle Metering Pipe System is a superior solution to current measurement techniques. The system uses general measuring system elements, has a flow accuracy that far exceeds anything available today and provides convenient data collection and reporting simply with a monthly reading by a meter reader. Installation is accomplished in half a day with an ordinary construction crew.

Read Dr. Replogle’s White Paper